Sök:

Sökresultat:

4319 Uppsatser om Quality costs - Sida 1 av 288

Kvalitetsbristkostnader-En fallstudie på Nordic Waterproofing AB : En fallstudie på Nordic Waterproofing AB

Quality can be defined as the ability of a business to satisfy their customers? needs and expectations. Total Quality Management is defined as the way to prevent, appraise and improve the entire organization to increase the product quality. In order to systematically increase quality in an organization, there are different quality systems in use. One example is process management, which is to divide the activities of processes.

Kvalitetssäkring

This thesis has been made in cooperation with Forsheda Stålverktyg AB which develops and manufactures injection moulds and diecasting tools. The main concern has been their Trading-system which provides them with considerable amount of quality lost function.Focus has to however be put on the analysis of the Trading-system due to the fact that this has previously meant various quality issues for the company.This thesis treats quality assurance of the Trading-system, identification of the problems in the process and improvements of these problems.Quality assurance is carried out when a company detects that their quality based costs become too high. Quality based cost are? the costs that would disappear if a company's products and its different operational processes were absolute? (Sörqvist, 2001 p.30, free translation from Swedish). High quality based costs often result in increased quality problems, which can lead to substantial economic loss for the company.This work has resulted in a thorough review of the Trading-system whereupon problems have been identified.

Kvalitetsbristkostnader: En kvalitetskostnadsuppföljning för produktion och eftermarknad. : En fallstudie vid Huddig AB

All companies wants? to be as profitable as possible. The company in question is one of the leaders in it´s field in Sweden. In order to increase profits as much as possible it is important to identify and eliminate eventual quality defect cost as far as possible.This study was performed in Huddig AB, and the purpose of this study is to try to develop a routine for monitoring the quality defect costs, and to improve communication and create feedback between production and aftermarket.In addition to an extensive literature review on quality defect costs most of the work have been conducted at the company. Own observations and interviews have been done with the staff to get a picture of the current situation and to try to come up with improvement proposals.During the study it was proved that much of the quality defect costs in essence, derived from the production, which is seen as positive because it is the easiest part of the company to improve.

Framtagning av nyckeltal som indikerar kvalitetsbristkostnader : Development of key performance indicators revealing the cost of poor quality

Since the 1980s, companies have taken a larger interest in quality and it´s economic impact within the company. Having the knowledge that it´s not quality that costs money, but it´s rather the lack of quality. The work immerses itself in the field of cost of poor quality and the development of key performance indicators.The thesis is performed at Bufab Holding in Värnamo. Bufab Holding is a trading company which mainly buys and sells C-parts. C-parts include fasteners, other small metal-, rubber- or plastic parts such as wires, springs and electronic fasteners.The aim of this thesis was to make a survey of the cost of poor quality and to find key performance indicators (KPI) for cost of poor quality that can be continuously monitored.

Kvalitetsbristkostnader i samband med reklamationsprocessen

During the 1970?s the interest for quality management and the concept of Quality costs increased considerably. Business leaders noticed that there was a great potential for reducing costs of poor quality. Since up to 10-30% of a company?s total turnover may consist of poor Quality costs some consider them as an unexploited goldmine.

Inträdes- och utträdesbarriärer : en studie över kunders rörlighet på den privata bankmarknaden

The purpose of this thesis is to map out and investigate how the banking sector affects a customer?s willingness to change bank, and what the switching costs are for a customer when making these changes. A case study was performed through qualitative and quantitative questionnaires and interviews. The qualitative part was carried out to create hypotheses. The hypotheses was tested in a quantitative survey to be able to either accepted or rejected these them.

Logistikflödet : En undersökning av företags medvetenhet kring logistikkostnader

The essay that you are now holding in your hand is a survey about how different companies calculate their logistic costs and the activities which are included. We have examined five companies within the county of Kalmar. The research objective has been to study how aware companies are about their logistic activities and costs. The conclusion of the report is that they put their logistic costs together with other costs which they distribute among their products. The companies identify additional logistic activities than costs which regarding to us is one step in the right direction towards the awareness concerning future effectiveness in the business..

IT-outsourcing ? dolda kostnader

Many corporations turn to IT-outsourcing to focus more on their core competence or to cut the IT-budget. There is one caveat, the costs presented at a first glance does not always present the entire truth. Instead the costs run deeper and so-called hidden costs exist beyond the contractual cost. Reducing these hidden costs may very well be crucial to the entire IT-outsourcing endeavor. However many firms are not aware of these costs and as such they have a reduced chance of success.

Kvalitetssäkring av material och tjänster inom byggentreprenadbranschen

Quality is the key to a well executed product or service. The construction industry hasn?t highlighted the quality in recent times which have contributed to the construction industry receiving much criticism in the field. The public sees it as an offhanded industry where errors and delays are common.The reason for this is considered to be primarily the lack of time, constant pressure to reduce costs and skills and the ability to communicate between the parties about what the correct quality really means. The industry has begun to realize that it must start setting clearer standards and that there are great opportunities for improvement.This report will give Peab an opportunity to develop their quality work.

Stubbtransporter och bränslekvalitet hos stubbved :

Stump wood is a hot alternative when the heating plants demands more and more forest fuel. The aim with the study has bean to calculate the costs in four different systems for transportations of stump wood, examine if there are any differences in fuel quality for the stump wood in the different systems, analyse if the fuel quality in stump wood is affected with the time it lays by the road side and how much space the stump wood demands on the road side. To calculate the costs for the different systems a system analysis was carried out, where some of the costs were collected through field studies on Holmen Skog stump experiment and other costs were collected from literature and contacts. Data for the fuel quality study was collected from Eons heat plant in Norrköping. Data for the study of how much space stump wood takes along a roadside was collected from field studies.

Vad kostar det?: Fallstudie av en banks kostnadsallokeringssystem

This paper investigates the internal product costing system in one of the Swedish banks with the purpose to evaluate the quality of its product costs and possible implications on decision making. The study shows that the current system distorts product costs by, among other things, using relative allocation of costs and time and by allocating all costs to individual units of products. We therefore propose an alternative product costing system, which mainly draws on ABC theory but is also adapted to the specific needs of service companies and of the Bank. This proposal is intended as a solution in this particular case and not to be generalized in other contexts. We hope however to add to the understanding of why more complex costing systems, such as the ones based on ABC theory are, according to previous studies, not widely used in practice.

Studie av kvalitetsbristkostnader vid Scania motortillverkning

Arbetet visar praktiskt hur en organisation kan utnyttja kvalitetsbristkostnader, för att sedan utifrån dessa identifiera möjligheter till förbättring. I arbetet används identifierade kvalitetsbristkostnader för att ta fram en projektplan för motortillverkningen. Projektets resultat ska medföra att kvalitetsbristkostnaderna vid motortillverkningen minskas. Arbetet börjar med att identifiera vilka kvalitetsbristkostnader som motortillverkningen har dokumenterat. Därefter tas en enkät med öppna frågor fram, vilken behandlar kvalitetsbrister vid motortillverkningen.

Strategisk/taktisk vägplan :

The purpose of this thesis was to create a strategic/tactical road access plan. This was done by designing an analytical method which gives the road manager a template to create long-term road access plans. The analytical method will help to identify and appraise roads to be upgraded and give information when it is time for building new roads. The study method involved developing an analytical method. The method was comprised of five main parts: the harvest plan, analysis of the road network, transport costs, quality and storage costs and finally, identification of investment alternatives.

Backsourcing : om dess orsaker, syften och alternativ

This paper examines the reasons behind firms considering backsourcing. While firms experience problems with their outsourcing activities, backsourcing emerges as an alternative solution. Firms primarily take cost considerations into account when reconsidering their outsourcing practices, but this only scratches the surface. A deeper analysis is needed, since cost increases arise from issues such as quality defects and cooperation problems. Even though production costs are low, outsourcing always implies transaction costs.

Om vikten av kvalitet. En studie av förändring i svensk hälso- och sjukvård.

The public health care sector has come under increasing pressure to cut down costs, maximize productivity and satisfy patients' needs during the 1990s and onwards. As a way of "getting more for less" quality management has been introduced. Originating in the private manufacturing industry, quality management has a strong focus on productivity and efficiency, aspects which are measured in quantitative terms. However, there are strong concerns that quality management is a means of speeding up the marketization of public health care by introducing core values much different from the ethic and medical norms that traditionally underpin health care organizations.This essay focuses on how quality management has been introduced to, and transformed by, public health care. A theoretical framework based on new institutionalism is constructed, and translation theories are used as a way of illustrating how the medical institutional environment, in fact, changes the concept of quality management.

1 Nästa sida ->